Toggle menu

6 Valley Road, Peacehaven, BN10 8AE

< Back

Address6 Valley Road, Peacehaven, BN10 8AE (also known as Block 324,
Peacehaven, East Sussex)
Issuing authorityLewes District Council 
Notice typeOperational Development Enforcement Notice 
Date notice issued27 October 2025
Date notice served27 October 2025
Date notice effective01 December 2025
Compliance due by

Remedial action in reference to points (1), (2), (3), (6) to be carried out within
six months from the date the notice takes effect on the enforcement notice.


Remedial action in reference to point (4) and (5) to be carried out within four
weeks from the date the notice takes effect on the enforcement notice.

The breach of planning control or condition, or activity prohibited by a Stop Notice

Without planning permission, the unauthorised operational development on the
Land comprising of:


• Engineering works including but not limited to:
1. Creation of hardstanding
2. Materially altering land levels through the importation of chalk
3. Erection of a retaining wall
4. Excavation of soil
• Siting of two caravans with services connected
• Importation of waste

Requirements of the notice

You must:


1. Remove the hardstanding, clear the resultant debris and return the
Land back to its former condition prior to the year 2022
2. Remove the imported chalk and clear the resultant debris
3. Remove the retaining wall and clear the resultant debris
4. Remove the two caravans including the connection to services
5. Remove the imported waste
6. Regrade the Land to match the adjoining land and reseed the Land
with grass.

Period for compliance

Remedial action in reference to points (1), (2), (3), (6) to be carried out within
six months from the date the notice takes effect on the enforcement notice.


Remedial action in reference to point (4) and (5) to be carried out within four
weeks from the date the notice takes effect on the enforcement notice.

Appeal grounds 
Date appeal lodged 
Date appeal decided (notice effective) 
Date appeal withdrawn 
Outcome of appeal 
Date notice compliance required on or before 
Statement of the requirements of the notice as Varied 
Date notice was complied with 
Date notice withdrawn 

 

Planning enforcement order cases

Case 
Applying authority 
Court 
Date of order 
Start date of enforcement year 
End date of enforcement year 
Details of any postponement 
Date of final determination or withdrawal of action 
The apparent breach of planning control identified in the order 
Location of breach of enforcement notice or breach of condition notice in Register 
Last modified on 27 October 2025
Share this page