Building Regulation Charges explained

Our fees and charges relevant to the type of work you are doing.

The charges for Building Regulation work are designed to cover the cost of providing the service and depend on what type of work you are doing.

If the work is within Eastbourne then the service is provided by the East Sussex Building Control Partnership. You can find more information by visiting East Sussex Building Control Partnership.

Methods of establishing the charge

There are two methods of establishing the charge for building works:

  1. Standard charges (a set cost)
  2. Individually determined charges (quotation by Building Control)
  • standard charges are for common domestic projects
  • if the type of work is not listed as a standard charge, the fee is based on the estimated cost of work from a tradesperson
  • larger schemes will be individually determined

We will give an individually determined quotation within five working days from the date of request. The quotation is valid for six months.

For a Full plans application:

  • you need to pay the Plan Charge when you submit your application. You will be sent an invoice shortly after you have submitted your application.
  • you will receive an invoice for the Inspection Charge upon commencement of works, after we've carried out our first inspection.

For a Building Notice application:

  • you need to pay the total Building Notice charge when you submit your application.
  • the fee covers all standard site inspections and a completion certificate.

There is an extra charge for large projects submitted under a Building Notice. This is because of the added complexity of ensuring compliance with the regulations.

Regularisation applications:

  • For works where an application was not made at the time and are considered unauthorised building work.
  • These are charged at 140% of the total Building Notice charge (no VAT payable).

Standard charges

  • Table A - for new dwellings not exceeding 3 storeys or 250m2
  • Table B - for domestic extensions, loft conversions and garages
  • Table C- for alterations to existing single dwelling houses

Works under categories B and C can be combined for a multiple work discount where the works will be undertaken at the same time.

Application charges guidance notes

You can download guidance notes on application charges below.

Fees valid from 1 November 2024

Table A

Standard charges for the construction of a new dwelling (not exceeding 3 storeys or 250m2)
CategoryFull Plans Plan Charge Full Plans Inspection Charge Building Notice Charge 
No. of DwellingsNETTOTALNETTOTALNETTOTAL
137545069082811701404
2515618960115216251950
3+Please ask for an individual fee assessment     

 

Table B

Standard charges for domestic extension, loft conversions and garages

Single storey extensions
CategoryDescriptionFull Plans Plan Charge Full Plans Inspection Charge Building Notice Charge 
  NETTOTALNETTOTALNETTOTAL
1Single storey extension <10m²285342290348575690
2Single storey extension 10 - 40m²285342535642820984
3Single storey extension 40 - 100m²33039661573810401248

 

Two storey extensions
CategoryDescriptionFull Plans Plan Charge Full Plans Inspection Charge Building Notice Charge 
  NETTOTALNETTOTALNETTOTAL
4Two storey extension <40m²2853425756908601032
5Two storey extension 40 - 200m²36043266579811301356

 

Loft conversions
CategoryDescriptionFull Plans Plan Charge Full Plans Inspection Charge Building Notice Charge 
  NETTOTALNETTOTALNETTOTAL
6Loft conversion excluding dormer(s)350420430516780936
7Loft conversion including dormer(s)3504205506609001080

 

Garages

CategoryDescriptionFull Plans Plan Charge Full Plans Inspection Charge Building Notice Charge 
  NETTOTALNETTOTALNETTOTAL
8Erection / extension of attached or detached single storey garage at ground level <100m²260312315378575690
9Conversion of integral garage to room240288295354535642

 

Table C

Standard charges for domestic alterations to a single building

Internal alterations and change of use
CategoryDescriptionFull Plans Plan Charge Full Plans Inspection Charge Building Notice Charge 
  NETTOTALNETTOTALNETTOTAL
1Alterations <£2,00022527000225270
2Alterations £2,001 - £5,00033039600330396
3Alterations £5,001 - £15,000220264270324490588
4Alterations £15,001 - £25,000275330340408615738
5Alterations £25,001 - £50,000350420430516780936
6Alterations £50,001 - £75,00044553459571410851302
7Change of use (an additional charge is also payable for any building works to be undertaken)20524600205246

 

Replacement windows, doors and electrical installations
CategoryDescriptionFull Plans - Plan Charge Full Plans - Inspection Charge Building Notice Charge 
  NETTOTALNETTOTALNETTOTAL
8Replacement windows / doors Per installation (1 - 8 units)20524600205246
9Replacement windows / doors Per installation (9 - <20 units)28534200285342
10Electrical work - Part P certificated000000
11Electrical work - BS7671 certificated, but non-Part P16519800165198
12Electrical work - non-certificated37044400370444

 

Underpinning and renovation of thermal element
CategoryDescriptionFull Plans - Plan Charge Full Plans - Inspection Charge Building Notice Charge 
  NETTOTALNETTOTALNETTOTAL
13Underpinning <£25,000240288295354535642
14Renovation of thermal element <£25,00024529400245294

 